Back to index
1 Background
1.1 These Standing Orders set out how Lancashire Fire Authority will contract its various requirements in line with governance legislation.
1.2 Completing any Procurement Process, the Authority must have regard to the objectives set out in the relevant Public Procurement Legislation, National Procurement Policy Statement (NPPS) and internal Contract Standing Orders. Objectives include:
1.2.1 Delivering value for money
1.2.2 Maximising public benefit
1.2.3 Remove barriers for Small and Medium Enterprises (SMEs), Voluntary Community and Social Enterprises (VCSE) and start-ups
1.2.4 Acting with integrity, transparency and proportionality
1.2.5 Sharing information and helping suppliers to better understand the authority procurement policies and decisions
1.2.6 Consideration for the inclusion of the Social Value Objectives
1.3 Contract Standing Orders aim to explain in simple terms the rules and procedures for obtaining written quotations and competitive tenders from Suppliers for the provision of Works, Goods and Services.
1.4 The Authority’s constitution incorporates Financial Regulations and Financial Procedure Rules that provide a framework for managing the Authority’s financial affairs. They apply to every Member and Officer of the Authority and anyone acting on its behalf.
2 Governance
2.1 These Contract Standing Orders (“the CSOs”) are made further to Section 135 of the Local Government Act 1972. These CSOs set out how the Contracting Authority will deliver against the obligation.
2.2 All procurement for contracts, by Authority staff (including where managed by an external organisation or public body on the Authority’s behalf), must comply with these CSOs, the Authority’s Financial Regulations, applicable Public Procurement Legislation and all other relevant UK legislation; with ‘applicable’ relating to the date on which the procurement is commenced or advertised, the Framework or Dynamic Market was established or where no competitive process is required, a purchase order is raised.
2.3 The Authority will comply with Procurement Policy Notes (PPNs) and the National Policy Procurement Statements (NPPS).
2.4 These CSOs should be read in conjunction with both the Financial Regulations and the Scheme of Delegation.
3 Officer responsibilities
3.1 Officers must ensure that each procurement requirement is dealt with in accordance with any statutory requirements including relevant legislation, is within budgetary provision and is in accordance with the constitution, these rules and all Service policies, procedures and strategies.
3.2 To ensure timely procurement activity, Chief Officers will delegate authority to appropriate employees within their Directorate, Services, Sections or Groups to procure on their behalf. Each Director must however provide and maintain a list of the officers authorised to initiate procurement, place orders and make payments specifying a maximum financial limit for each transaction within any pre-defined limits. The Scheme of Financial Delegation should be reviewed regularly. Officers must ensure before beginning any procurement that they have the appropriate authority to undertake it by means of delegated authority.
3.3 Chief Officers will ensure that all employees authorised to initiate procurement, place orders and make payments have the appropriate knowledge, skills and training to undertake the same.
3.4 The Procurement team is responsible for all procurement processes and compliance, including ownership of the project initiation documents, procurement option appraisals and process design, procurement training, procurement process management (including responsibilities for all notices up to the publication of the Contract Award Notice), ownership of the e-tendering portal, ownership and provision of all procurement templates, completion and approval of procurement templates and reports, and oversight of all activities to waivers, contract modifications or termination.
3.5 The Contract owner or Head of Service is responsible for supporting the planning for and management of all contracts (regardless of how they are procured); forward planning for re-procurement of cyclical requirements (including writing specifications for goods and services to be procured); overseeing all technical documents (including specifications); organising any legal documents that are required; supporting all stages of the procurement process; co-ordinating the resourcing of tender evaluation and moderation sessions; completing any procurement related reports and any pre-contract governance requirements.
4 Procurement thresholds and processes
4.1 Procurement thresholds determine which routes to market are available and what rules must be followed. Thresholds come from applicable Public Procurement Legislation and are based on the Government Procurement Agreement (GPA); these values are updated every other year.
4.2 The rules and available routes to market are determined by whether the estimated contract value is deemed to be “Above Threshold” (Covered Procurements or Public Contracts) or “Below Threshold.”
4.3 The Procurement Thresholds (see table 1) apply to all spend where it is not included within the scope of the waiver category detailed in section 6.
4.4 All spend must be classified by type and regime before a procurement process can be designed; this is due to different types and regimes having different financial thresholds and obligations.
Types:
4.4.1 Goods (supplies or products)
4.4.2 Services (labour, consultants, or technical resources)
4.4.3 Works (Construction Projects)
Regimes:
4.4.4 Utilities (gas, electricity, water)
4.4.5 Light Touch (legal services)
4.4.6 Concession (supplier risk or aid by service users)
4.4.7 Exempt or Excluded (not covered)
4.5 Before a procurement process can be designed or commenced:
4.5.1 Officers need to decide both the initial and maximum contract durations (including any optional extension) and what might be the justification to apply those extensions.
4.5.2 Depending on the value and nature of the contract being procured, the duration may be limited by the Applicable Public Procurement Legislation. Officers must check with Procurement Manager before finalising the decision.
4.5.3 The estimated contract value must include the total value that could be paid over the maximum life span of the contract regardless of the chosen route to market. The value must incorporate all planned costs, additional requirements, fee or commissions, aggregate or associated goods and services or works, parts and labour, contract extensions. The contract value must include any applicable VAT.
4.5.4 Where the estimated total value of a Contract exceeds or is within 10% of the relevant threshold (as set out below), the procurement must be conducted in accordance with the appropriate Procurement Rules and the appropriate UK guidelines. The application of the Procurement Rules and the appropriate UK guidelines cannot be waived by the Authority.
4.5.5 When considering the above, the Authority have a duty to consider the use of lots and the potential benefits this may offer such as removing barriers to local SMEs, achieve economies of scale and to manage the potential market.
Table 1 – Threshold Procurement Process
Threshold Banding (including VAT) | Requirement | Procurement Type | Method to Procure |
|---|
Up to £30,000: Goods and Services, Up to £50,000 Works. | Minimum of one written quote | Unregulated | Procurement portal for £30,000 and over. |
Between £30,001 and £100,000: | Minimum of three written quotes | Regulated below threshold | Procurement Department, Procurement Portal and Find a Tender Service |
Between £100,001 and £214,904: | Open Tender | Regulated below threshold | Procurement Department, Procurement Portal and Find a Tender Service |
Over £214,904: | Open Tender Procedure or Competitive Flexi Procedure | Regulated above threshold | Procurement Department, Procurement Portal and Find a Tender Service |
5 Excluded or exempt contracts (not regulated)
5.1 In line with the Public Procurement Legislation these standing orders do not apply to contracts that are classified as excluded or exempt as defined by the applicable public procurement legislation Exemptions include:
5.1.1 Contracting Authority to Contracting Authority (Subsidiary) arrangements, vertical or horizontal – subject to approval by the Monitoring Officer, for example:
5.1.1.1 Vertical - The Contracting Authority exercises a parent or similar control or joint control with other Contracting Authorities on the entity as it does with its own departments, the entity carries out more that 80% of its activities for the controlling Contracting Authorities and there is no private sector money in the entity.
5.1.1.2 Horizontal - Contracting Authority to Contracting Authority cooperation to achieve objectives which the Contracting Authorities have in common, through an arrangement that is solely for the public interest, and no more than 20% of the activities envisaged by the arrangement are intended to be carried out for reasons other than for the purposes of their public functions.
5.1.2 Subject matter exemptions:
5.1.2.1 Certain types of legal advice, such as relating to judicial proceedings or dispute resolution.
5.1.2.2 Certain types of financial advice, such as funding or financing arrangements, investment services.
5.1.2.3 Employment contracts.
5.1.2.4 Purchases made at public auction or of goods sold due to insolvency.
5.1.2.5 Land contracts (including leases, licenses, and transfers.
5.1.2.6 Grants of money, these cannot be contracts as there is no consideration, and they are not services required to be delivered by the Authority.
5.1.2.7 Any other arrangements excluded by the Applicable Public Procurement Legislation.
6 Waiver to Contract Standing Orders procedure
6.1 Any Officer requesting the right to waiver Contract Standings Orders must seek advice from the Procurement Team before engaging with any supplier. Any request to waiver the relevant procedure must be the form of a written report identifying the justification for requesting exemption. The waiver value must include all aggregated spend with the supplier and be inclusive of VAT. All exemption requested must be submitted to the Deputy Head of Procurement using the Waiver Request form.
6.2 Circumstances a waiver can be considered:
6.2.1 Effective competition is prevented due to government control.
6.2.2 The supply or service is unique to a single supplier such as proprietary or patented goods or is deemed necessary due to the requirements of operational alignment and there is no satisfactory alternative.
6.2.3 The service or works are of a specialist nature and can only be carried out by one supplier.
6.2.4 The emergency requirements are brought about by events that could not have reasonably been foreseen.
6.2.5 If the goods or services are not procured there is a risk of danger to life or property or a major impact on the Authority or the public.
6.2.6 The market is such that effective competition does not exist, and it can clearly be demonstrated that the proposed award represents best value for the Authority.
6.3 It is the responsibility of the Procurement Department to record any waivers on the contracts register and publish the award notice in accordance with the applicable Procurement Legislation.
6.4 For all procurement projects with a total Contract value under £100,000 (including VAT) the Chief Fire Officer and Treasurer (Director of Corporate Services) can approve a waiver. The Procurement Department will facilitate the request approvals from the relevant Officers.
6.5 Any waiver relating to procurement projects in excess of £100,000 but not exceeding the relevant Procurement Threshold (including VAT) must be approved in consultation with the Chair of Combined Fire Authority.
6.6 Please refer to table 2 below for authorisation signatories required in regard to financial limits for waivers:
Table 2 – Financial Limits
Financial Limit | Head of Procurement | CFO | Treasurer and Executive Board | Combined Fire Authority |
|---|
Under £100,000 (including VAT) | Y | Y | Y | - |
Over £100,001 (including VAT) | Y | Y | Y | Y |
7 Contracts awarded under framework
7.1 The Authority may award a public contract or a regulated below threshold contract that is covered by a framework which the Authority has concluded, or which another Contracting Authority has concluded and which the Authority is permitted to use. Such contracts are also known as Call Off Contracts.
7.2 Any Call Off Contract must be signed by all parties no later than the last date of the enabling framework.
7.3 Any decision to award a Call Off Contract from a framework shall be taken in accordance with the terms and conditions of the relevant framework.
8 Pre-procurement and tender requirements
8.1 A full set of procurement or associated tender documents must be published alongside the tender notice of which suppliers can access on the Central Digital Platform and the Procurement Portal.
8.2 All competitive procedures must be managed and shared through the e-tendering portal including, supplier communications, and clarifications (with the exception of anything commercially sensitive).
8.3 The Procurement team will hold an organisation Pipeline. For all procurements valued at (£2 million including VAT) the authority must publish a Pipeline notice no later than the 26th of May each financial year.
8.4 Before publishing a tender notice for a Regulated Procurement, the Authority shall consider whether to undertake preliminary market engagement. Where the Authority undertakes preliminary market engagement, it shall, unless it has good reason not to publish a preliminary market engagement notice. Officers must ensure that any preliminary market engagement does not put any suppliers at an unfair advantage; or otherwise distort competition.
8.5 The Authority may undertake preliminary market engagement for any Unregulated Procurement in such a manner as it deems appropriate, provided such engagement does not put any supplier at an unfair advantage or otherwise distort competition.
8.6 Before commencing a Regulated Procurement, the Authority shall consider whether the requirement could reasonably be supplied under more than one contract and whether such contracts could appropriately be awarded by reference to Lots. Any reason to not include Lots must be recorded in the Tender Notice.
8.7 The Authority may make a direct award if the award meets the requirements of the Direct Award Justifications of Schedule 5 of the PA and must publish a transparency notice.
9 Regulated Procurement - tenders
9.1 Regulated Procurement shall be undertaken in a way which is fully compliant with the PA.
9.2 The scope of this section covers all of the Authority’s above PA threshold requirements, except where the contract is awarded under a Framework or a Dynamic Market or a justification exists for a Direct Award.
9.3 Regulated Procurements shall be conducted applying either the Open Procedure or the Competitive Flexible Procedure. A decision to follow the Competitive Flexible Procedure shall be made only after consultation with the Procurement Team.
9.4 All tender opportunities must be commenced by the publication of a tender notice and be placed on the Procurement Portal and the UK E-notification service. In the case of a Competitive Flexible Procedure, the tender notice shall either invite suppliers to submit a request to participate in the process or invite suppliers to submit their first or only tender as part of the procedure. Officers shall seek the advice of the Procurement Team as to which of the forms of tender shall be used in those circumstances.
9.5 No tender opportunity shall be placed on the Procurement Portal and the UK E-notification service until the Authority has prepared a specification for the goods, works or services, the conditions of contract, the conditions of participation and the invitation to tender (Open Procedure) or participate in the Competitive Flexible Procedure.
9.6 Each invitation to tender or participate shall contain the following information:
9.6.1 A statement of the validity of a submitted tender (which shall not be less than 90 days).
9.6.2 An anti-collusion certificate.
9.6.3 A form of tender.
9.6.4 The evaluation criteria, the weighting to be applied to such criteria and the scoring methodology for assessing the evaluation.
9.6.5 In the case of a competitive flexible procedure a statement as to whether the procedure will be conducted in successive stages and if so whether the Authority intends to refine the evaluation criteria or the weightings.
9.6.6 A statement as to whether a parent company guarantee, a performance bond or other security is required from the suppliers.
9.6.7 A statement that the Authority is not bound to accept any tender.
9.6.8 Notification that tenders are submitted at the bidder’s expense.
9.7 Clarification questions relating to the procurement may be asked by bidders up to six days prior to the tender submission deadline. The Authority shall respond to all clarifications as soon as reasonably possible and no later than four days prior to the tender submission deadline. All responses to clarification questions shall be provided to all bidders, unless the bidder requesting the clarification has indicated that the question is confidential. Where a bidder has indicated that a question is confidential, the officers shall seek confirmation from the Procurement Team as to whether it is agreed that the information is confidential. If the Authority agrees, the response shall be sent to the bidder who submitted the clarification question only. If the Authority disagrees, the bidder which submitted the question shall be given the opportunity to withdraw the question. If the question is not withdrawn, the response shall be provided to all bidders.
9.8 All communication with bidders in an Open Procedure shall be conducted through the Procurement Portal. Officers and members shall make no direct contact in person, telephone or email with suppliers under any circumstances.
9.9 All communication with bidders in a Competitive Flexible Procedure shall be conducted through the portal, except to the extent that the Authority has determined the formal structure of the procedure to include face to face or online meetings.
9.10 No post-tender clarification shall be undertaken in an Open Procedure except with the agreement of the Procurement Team.
9.11 Post-tender clarification may be undertaken in a Competitive Flexible Procedure provided it has been allowed for as part of the procedure or is authorised by the Procurement Team.
9.12 Post-tender negotiations are not permitted in an Open Procedure. Negotiations may be undertaken at any stage in a Competitive Flexible Procedure, provided that they have been allowed for as part of the procedure. However, even where such negotiations have been allowed for in the procurement as part of the outlined procedure, they shall not be undertaken without the presence of the Procurement Team.
10 Opening of tenders and quotations
10.1 After the designated deadline stipulated for submission of responses, the Procurement Department will co-ordinate the opening of all submissions which will be retained in a virtual ‘sealed box’ until the designated opening time.
10.2 All tender responses via the e-portal must be opened by the Procurement Department. A representative from the budget holders department can also attend if they wish to.
10.3 The Procurement Department is responsible for making arrangements to receipt, store and open tender documents.
11 Regulated Procurement – participation conditions and supplier exclusion
11.1 It is not a requirement of the PA to set Conditions of Participation, which assess a potential supplier’s legal and financial and technical ability to carry out the contract. However, the Authority ordinarily will set Conditions of Participation to ensure that a potential supplier has the requisite capacity and technical ability to perform the contract. The approval of the Procurement Team will be required to proceed with a procurement without the Authority setting Conditions of Participation as part of the procedure. Where Conditions of Participation are required, the PA does not prescribe the means of proof relating to these conditions, but any conditions set must be a proportionate means of ensuring suppliers have the relevant capacity or ability, having regard to the nature, cost and complexity of the contract. The Authority may not request information, as a Condition of Participation, which is expressly prohibited by section 22(4) of the PA.
11.2 The Authority may exclude a supplier from participating or progressing in a competitive tendering procedure when the supplier has not satisfied the Conditions of Participation.
11.3 The Authority shall disregard any tender from a supplier that is an Excluded Supplier. An Excluded Supplier is defined within the PA.
11.4 Before conducting the evaluation of an Open Procedure tender, the Authority shall consider whether the supplier is an Excludable Supplier.
11.5 Where the Authority receives a tender from an Excludable Supplier, it shall consider whether it shall allow or disregard that tender. No decision to allow or exclude an Excludable Supplier shall be taken without the agreement of the Head of Procurement.
11.6 As part of every tendering procedure, the Authority shall request information about whether a supplier is intending to subcontract any part of the performance of the contract and shall request that such information as is deemed necessary to determine whether the subcontractor is an Excluded Supplier or an Excludable Supplier.
11.7 Where a proposed subcontractor is an Excludable Supplier, the Authority shall treat the supplier as an Excludable Supplier.
11.8 Where the Authority determines to exclude the supplier it shall notify the supplier of its intention and give the supplier a reasonable opportunity to find an alternative subcontractor.
11.9 The Authority shall exclude a supplier if it acts improperly, and its behaviour puts it at an unfair advantage in relation to the award. A supplier is deemed to have acted improperly where it:
11.9.1 Fails to provide information requested by the Authority,
11.9.2 Provides incomplete, inaccurate or misleading information.
11.9.3 Accesses the Authority’s confidential information; or
11.9.4 Unduly influences the Authority’s decision making in relation to any contract.
11.10 Where the Authority excludes a supplier, it shall notify the Cabinet Office.
11.11 The Authority shall exclude a supplier which is on the Debarment List or is an Associated Person of a supplier on the Debarment List.
12 Regulated Procurement – evaluation
12.1 Officers are required to design and effectively communicate the evaluation or assessment methodology that will be applied to the tender responses submitted by suppliers. This must include detailing whether the assessment methodology will be based on lowest price (where permitted), price per quality point or a price to quality ration. In each case, the following with apply:
12.1.1 For quality and social value – the detailed questions include specific response guidance, the scoring methodology or matrix, and the importance or weighting to be applied to each question.
12.1.2 For price – details on how the value will be calculated and how it will be evaluated or divided by the quality score.
12.2 A public contract shall be awarded to the most advantageous tender which satisfies the Authority’s requirements, and award criteria. The award criteria must relate to the subject matter of the contract and be clear, measurable, specific and proportionate having considered the nature, complexity and cost of the contract. Technical specifications of contracts must satisfy PA requirements.
12.3 Award criteria must not be amended after the Tender Notice had been published.
12.4 An evaluation must be made of all tender or quotation responses by an evaluation panel. The number of people on the evaluation panel will be a minimum of two but it can vary depending on the type and complexity of the Contract.
12.5 The evaluation will include a comparison of the tender sum against the estimate for the Goods, Services or Works prepared in advance of the Suppliers being invited to tender or quote. Where errors or discrepancies are found that may affect the tender or quote sum, the Supplier may be notified in writing and afforded an opportunity to confirm the submitted sum without amendment, amend their bid to correct an arithmetical error, or withdraw their bid. A written record of any revisions or withdrawals must be maintained.
12.6 The Authority will evaluate and award Contracts to the Supplier(s) it considers offers the best value having regard to both price and quality factors. This is referred to as the ‘most advantageous tender’ (MAT) and provides for the Contract to be awarded to the Supplier best able to meet the Authority’s requirement, specification and budget.
12.7 Both supplier tender and quotation responses must be delivered to the designated e-tendering system by the date and time specified. Late tender and quotation responses should be rejected unless it is proven that the reason for the late submission was due to technical failure of the portal.
12.8 The Authority has the right (but is not obliged) to seek clarification on the submissions as part of the evaluation process. Where this prerogative is utilised, all suppliers will be treated equally.
13 Clarification and negotiations
13.1 After the receipt of responses, officers may need to contact bidders to clarify technical and contractual information as part of the evaluation process. Any such communication must be confidential, and a written record made of the reason for contact and the outcome.
13.2 Any negotiation with a bidder to specifically discuss the pricing submitted in their tender response should:
13.2.1 Be undertaken only by the Procurement representative in the presence of at least one officer who isn’t involved in the project (the Independent Observer). All negotiations must be conducted confidentially and in a manner which provides equal opportunity for all Suppliers who have provided responses, and which maintains the highest levels of probity;
13.2.2 At the conclusion of negotiations each Supplier must be invited to submit a best and final price.
13.3 Where post-tender negotiation results in a fundamental change in specification (or contract terms) the contract must not be awarded and must be re-tendered.
13.4 If a supplier attempts to negotiate a contract post award, where this is not permitted, the Authority may disregard the supplier and award the contract to the next ranked compliant supplier.
14 Contract award – tenders and quotations
14.1 The award of a Contract to the successful Supplier(s) must be conditional upon the tender costs being within budgetary limits and subject to the appropriate approval being granted to proceed.
14.2 Following completion of the evaluation of responses to an opportunity with a value above £30,000, a tender evaluation report must be completed. The report will validate best practice and the requirements of the Authority’s Financial Regulations and Financial Procedure Rules.
14.3 A contract rewards report must be completed and authorised as outlined in the table below (on the basis that the relevant managers have been consulted with):
Financial Limit (including VAT) | Department Head | Relevant Director | Treasurer |
|---|
Up to £30,000 | Y | - | - |
£30,001 - £100,000 | Y | Y | Y |
Over £100,000 | Y | Y | Y |
14.4 For all above threshold or covered procurements, the Authority must apply a minimum eight-day standstill period before entering into the contract (excluding Utilities, Light Touch or contracts awarded under Framework, in which case a standstill period is optional). This provides the opportunity for unsuccessful suppliers to request debrief information and to potentially challenge the decision formally before a Contract is signed.
14.5 All unsuccessful suppliers must be notified of the outcome of the procurement promptly in writing providing the reasons for elimination from the process including:
14.5.1 The criteria for the award of the contract.
14.5.2 The reason for the decision, including the characteristics and relative advantages of the successful tender.
14.5.3 The score (if any) obtained by the bidder to whom the notice is addressed and that of the successful bidder.
14.5.4 Social Value commitments.
14.5.5 Any reason why the unsuccessful bidder did not meet the technical specifications.
14.5.6 The name of the successful bidder.
14.6 Disclosure may be withheld if any of the following apply:
14.6.1 Impede law enforcement.
14.6.2 Otherwise be contrary to public interest.
14.6.3 Prejudice the legitimate commercial interests of any economic operator.
14.6.4 Might prejudice fair competition.
14.7 The formal contract award notice must be published on the Central Digital Platform within 30 days of the award of the contract.
14.8 The successful Supplier(s) should be notified promptly in writing following acceptance of the tender or quote response and the Contract must be issued to the Supplier with a formal request to sign and return two copies. On receipt of the signed Contracts from the Supplier, the Authority will sign the Contract to form the legally binding agreement, returning one copy to the Supplier(s). All Contracts and orders shall be in writing and made in the name of the Authority.
15 Contracts awarded under Dynamic Markets
15.1 The Authority may establish arrangements for the purpose of awarding public contracts known as a Dynamic Market by submitting a Dynamic Market Notice to the UK E-notification service and Procurement Portal.
15.2 In establishing a Dynamic Market, the Authority shall set conditions for participation relating to the legal and financial capacity to perform contracts to be awarded by reference to membership of the Dynamic Market and which have the technical ability to perform the contract. Such conditions shall be proportionate to the requirements, having regard to the nature, complexity and cost of the contract to be awarded.
15.3 To award a public contract under a Dynamic Market, the Authority must utilise the Competitive Flexible Procedure.
15.4 If a tender is submitted by a supplier which is not a member of the Dynamic Market, the Authority shall exclude the supplier unless the supplier has made an application for membership of the Dynamic Market and the Authority has accepted the application.
16 Purchasing from a Centralised Procurement Authority
16.1 The Authority may purchase goods, services or works from a Centralised Procurement Authority without the need for additional competition. Note this is not the same as a procurement framework which a Centralised Procurement Authority has set up.
17 Collaborative procurements
17.1 Where the Authority is required under its own powers or at the request of a partner authority to procure on its behalf, those procurements must apply with Applicable Public Procurement Legislation and other relevant legislation more generally.
17.2 Each Authority must comply with its own Contract Standing Orders with regards to financial, procurement and delegated authority requirements and its owner scheme of delegation for contract signing.
17.3 The Policing and Crime Act 2017 places a duty on police, fire and ambulance services to seek opportunities through collaboration where it is efficient or effective to do so.
17.4 The Procurement team will review all new procurement requirements, ensuring all opportunities to collaborate with partner organisations are exploited where they offer benefits to the Authority and collaborate with partners to develop new joint contracts.
18 Sealed contracts and record keeping
18.1 All Contracts which relate to the purchase of land or have potential long-term liabilities and would benefit from the added legal protection afforded by the process of sealing shall be made by affixing the Common Seal. This shall only be attested by the Monitoring Officer to the Authority, the Authority solicitor, the CFO (Chief Fire Officer), DoCS (Director of Corporate Services) or DoPD (Director of People and Development). All other contracts will be signed by either the DoCS or relevant Head of Department; Area Manager or member of the Executive Board.
18.2 In every written Contract for the execution of Works or the supply of Goods or Services the Supplier shall be prohibited from transferring or assigning or novating directly or indirectly to any person or persons whatever, any portion of that Contract without the written permission of the Authority. Sub-letting, other than that which may be customary in the trade concerned, shall be prohibited.
18.3 All submissions and supporting documentation for any procurement must be retained for seven years from the commencement of the Contract by the Procurement Team.
18.4 All ordinary contracts must be retained for seven years after expiry and contracts under seal thirteen years after contract expiry.
19 Contract management
19.1 All contracts must be managed in accordance with the Procurement Legislation. The Contract manager is the Budget Holder or Project Owner, and is responsible for meetings and Performance Management.
19.2 The Contract Manager will set up a series of meetings to kick off, administer and manage delivery of the contract. These meetings will as a minimum monitor and report on the following:
19.2.1 Supplier and Supply Chain Suitability – ensure that the Contracting Authority is not contracting directly or indirectly with unsuitable (Excluded or Excludable) suppliers.
19.2.2 Key Performance Indicators – delivery against the agreed criteria. KPIs are mandatory for all contracts over £5 million and must include a minimum of three KPIs.
19.2.3 Contract Performance, for example satisfactory delivery of the contract.
19.2.4 Contracting Authority Payment Performance –the Contracting Authority is required to pay the Supplier within 30 days of receiving a valid or undisputed invoice.
19.2.5 Supplier Payment Performance - the Supplier is required to pay their supply chain within 30 days of receiving a valid or undisputed invoice.
19.2.6 Supplier Contracts – the supplier is required to enter into a legally binging agreement with suppliers on whom they are relying on to meet the technical, legal, or financial conditions of participation.
19.2.7 Modifications – all modifications to a contract must be documented, along with the value and justification.
20 Term of Contract
20.1 The term of a Contract may be extended with the approval of the budget holder if there is provision within the Contract Terms and Conditions to extend and the agreement of the Director of Corporate Services has been given with regards to budgetary provision. If the Contract has already been extended to the full extent within the provisions of the existing Contract, it cannot be extended further.
20.2 If there is no provision within the Contract Terms and Conditions for the Contract to be extended the approval of the Monitoring Officer to the Authority, and the Treasurer must be sought to any proposed extension of the term of the Contract and a record kept of the reasons.
20.3 The Contract term cannot be extended where this would result in the total contract value exceeding the procurement thresholds.
20.4 In order to avoid any issues with the above it is best practice to ensure that Contracts are re-tendered in line with these Contract Standing Orders well in advance of their completion date.
21 Contract modifications
21.1 All modifications must be managed in accordance with the contract and in compliance of what is permitted under the applicable Public Procurement Legislation, namely Schedule 8 of PA.
21.2 It is necessary to publish a contract change notice for any modification except for a below threshold modification and a modification which increases or decreases the term of the contract by less than 10%.
22 Termination
22.1 In the event any performance requirements are not being met, the Contracting Authority may terminate the contract in accordance with the stated contract clauses. Where required, this is to be reported in accordance with Applicable Public Procurement Legislation.
23 Notices
23.1 Where required under Applicable Public Procurement Legislation, the Contracting Authority may be required to publish a notice. The notices that may be required include the following:
23.1.1 Contract Performance Notice – used to report on KPIs and whether the contract is being delivered to the required standards.
23.1.2 Payment Compliance Notice – used to publish the Contracting Authority’s payment performance.
23.1.3 Contract Modification Notice – used to publish details of a proposed modification to a contract where there is an increase or decrease in the estimated contract value over a specific value.
23.1.4 Contract Termination Notice – used where the Contracting Authority terminates a contract in full.
24 Corrupt practices
24.1 In every written Contract a clause must be inserted to ensure that the Authority is entitled to terminate the Contract and recover from the Supplier the amount of any loss resulting from such termination, if the Supplier has:
24.1.1 Offered, given or agreed to give to any person a gift or consideration of any kind as an inducement or reward for doing or not doing anything related to the Contract or any other Contract with the Authority.
24.1.2 For favouring or not favouring any person in relation to a Contract, by any person employed by the Supplier or acting on their behalf.
24.1.3 The Supplier, or any person employed by them or acting on their behalf, has committed an offence under the Bribery Act (2010) or any amendment of the Act.
24.1.4 Shall have given any fee or reward, the receipt of which is an offence under the Local Government Act 1972.
24.1.5 All Authority members and officers must comply with the Authority's anti-fraud or anti-bribery policies and relevant codes of conduct.
25 Third parties
25.1 In cases where a third party, such as a local authority, private architect or consultant is employed to act for the Authority in the carrying out of Works or purchase of supplies, it shall be a term of their appointment that they shall:
25.1.1 Observe or otherwise secure the observance of the procedures prescribed within these Contract Standing Orders;
25.1.2 Produce on demand, all records maintained by them in relation to the Contract; and
25.1.3 On completion of a Contract, transmit all such records to the Procurement department.